The curing process
Curing of slabs is a chemical process. Reactions between sand, cement, and water result in a final product with optimal strength. This process takes between 12 and 24 hours, depending on whether natural or conditioned curing is chosen.
- Steel pallets for slabs during curing
- The dimensional stability and quality of the steel pallet determines the dimensional stability and quality of the slab
- Pallets can be delivered with or without a protective layer.

- Storage system for pallets with slabs that are curing
- Multiple systems available: with cranes or roller conveyors
- Space can be conditioned and insulated if desired
